Showing posts with label Townhouse Villa. Show all posts
Showing posts with label Townhouse Villa. Show all posts
Monday, January 4, 2010
Townhouse Villa Second Floor Front
The two large Green rooms and the two large Red rooms are bedrooms. The small Red, Green and Yellow rooms are storage rooms. The stairway has a Yellow strip beside it. The small Blue square is the water pool in the first floor Atrium. The White square is the top of the Atrium columns. The Yellow square is the handrail around the second floor balcony. The large Blue square is the second floor balcony.
The next project will be to design and make a roof to cover the front and back sections of the villa and a roof extension to cover the passages around the garden.
Friday, December 25, 2009
Townhouse Villa Room Walls
All of the room walls have been put up now on the ground floor, Two of the four garden colonnades are now completed. The only things now remaining for this level are the stairwell, slave ladder, the last two garden colonnades, (all of which are in work) and the painting of each room floor When those items are finished I shall be pleased to take some pictures of the ground floor of the villa and put them here on this blog. We are having some computer difficulty at the moment, but hopefully after Christmas we will be able to move ahead both on the villa construction pictures, as well as the study of the Roman City of "Lucentum."
Thursday, December 24, 2009
Townhouse Villa Transverse Walls
Today the transverse walls on the ground floor of the townhouse villa have been completed. The next task will be to put up the shorter walls dividing the rooms with their individual doorways, and design the stairs to the upper floor as well as the ladder for the slave quarters above the kitchen and kitchen storeroom.
Subscribe to:
Posts (Atom)

